Description

Date: 06/01/2014 To: 16/01/2014

 Marshalls Cobbletech Driveway Mells , Hoylake Wirral

 

This Cobbletech Driveway Project is being carried out in the Mells area Hoylake in the Wirral area of Merseyside. Here we are installing Marshalls  Cobbletech to a 98m2 area of driveway and front garden including kerb edgings and a lineal drainage system. 

 

Cobbletech Driveways

 

Day 1: Excavation of driveway by breaking up the concrete using a heavy duty breaker and a mini excavator

 

Day 2: We are continuing to excavate the drive and we starting to install the new foundations using Mot Grade one crushed stone ready for compaction

 

Day 3 + 4:  We are completing the installation of the foundations

 

Day 5: Installation of kerbs to retain new lawn area and installation of topsoil ready for new turf.

 

Day 6: Installation of lineal drainage system & construction of Walling.

 

Day 7: During the continuation of wall construction, installation of manhole and compaction of MOT.

 

Day 8: During compaction of sand and installation of Cobbletech.

 

Day 9: Continuation of installation of Cobbletech.
 

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

2007

2006

 

Free Call-Back

Would you like to talk to us in person? Fill in your details here and we will call you!