Description

Date: 13/06/2013 To: 27/06/2013

Marshalls Cobbletech Driveway 

Prenton -  Wirral

 

This is another part of an existing project we are doing:

 

Fairstone Sawn Patio 

 

In this project we will be installing a new driveway using Marshalls Cobbletech. This includes us installing a lineal drainage system and a recessed manhole.

 

Day 1 Today we excavated all the ground area and existing tarmac.

 

Day 2 Today we installed the hardcore and the lineal drains.

 

Day 3 All manholes have no been installed and we have started to install the sand.

 

Day 4 Sand is now completed and compacted ready for cobbletech to be installed.

 

Day 5 We have installed a brick border to support the cobbletch which has also now been installed

 

Day 6  On day six we have started to install a step for the front using cobbletech along with continuing the installation of the cobbletech driveway.

 

Day 7 We have now completed the installation for the cobbletech step and driveway, along with turfing the front garden for a nice finished fresh look.

 

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

2007

2006

 

Free Call-Back

Would you like to talk to us in person? Fill in your details here and we will call you!