Project 7 Garden -Makeover
Before garden transformation
Description
Date:
25/05/2009
To:
18/06/2009
Rear Garden Transformation
This project was carried out in around 15 working days in the Woolton area of Liverpool Merseyside L18.
The garden before we started had a major drainage problem and the existing lawn was suffering.
The design of the new garden was to incorporate a raised deck with a seating area around the tree in the corner.
We installed new fence posts to add strength to the existing fence.
We installed a new path and patio using Natural stone with a raised area, retained with reclaimed cobbles.
We also created raised beds retained with treated sleeper like timber.
We re pointed the twelve high garden wall after removing the infested ivy.
We installed a drainage system with land drains. and finally we installed new turf , top soil and planted the borders.